Skip to content
TestLine Menu
TestLine
QA process

What should you test in an MVP before launch? A checklist

A list of what to check before your first release, split into what to do in one day and what in one week.

author
Artur Machowski, Senior QA Engineer
published
reading
8 min

Short answer

Before an MVP launch, first check the 5-10 paths without which the product makes no money: sign-up, login, the core feature and payment. One day is enough for that. In a week you can add forms, emails, 4 browser and device combinations, basic performance and accessibility, and a rollback plan.

The minimum for 1 day and for 1 week

area1 day1 week
critical pathsyes, all of themyes, plus negative scenarios
paymentssuccessful payment and declinerefunds, 3-D Secure, webhooks, invoices
sign-up and loginsign-up, login, password resetsession expiry, role permissions
emailsdo they arrivecontent, links, spam folder, mobile view
formsthe main formvalidation of all fields, server errors
browsers and devices1 desktop browser, 1 phone4 combinations, different resolutions
performancehome page load timeCore Web Vitals, a simple load test
accessibilitynoa basic check
monitoring and rollbackerror logs workalerts, a rehearsed rollback
data and GDPRconsents in formsaccount deletion, data export, policy

If you only have one day, test from the top of the table down. Each row below has less effect on whether the first customer pays.

Critical paths

A critical path is a sequence of steps whose failure stops the business. A typical MVP has 5-10 of them. Write them down before you start testing:

  • landing on the site and signing up;
  • first login and onboarding;
  • the core feature, the thing the customer pays for;
  • a purchase or starting a subscription;
  • contacting support or reporting a problem.

Walk through each path on a clean account, without data from development. Check the negative paths too: what does the user see when something goes wrong? A blank page or an “Error 500” message is the most common reason early users don’t come back.

Payments

  • a successful payment with the payment provider’s test card;
  • a declined payment and a clear message for the customer;
  • a payment that requires 3-D Secure (providers have separate test cards for it);
  • abandoning the payment halfway and returning to the app;
  • the confirmation webhook: does the order change status, also when the webhook arrives late or twice;
  • refunds, subscription cancellation, plan changes;
  • the invoice or receipt: amounts, VAT, company details.

Before launch, switch the keys from test mode to live mode and make one real payment for a small amount. It’s the most often skipped step, and a key configuration error only shows up with the first customer.

Sign-up and login

  • sign-up with valid data and with an email address that already exists;
  • email confirmation: the link works, expires and can’t be used twice;
  • login, wrong password, lockout after many attempts;
  • password reset from start to finish;
  • sign-in with Google or Apple, if you offer it;
  • logout and session expiry;
  • permissions: a user can’t see another user’s data after changing an ID in the URL.

The last point is a basic check, not a security test. If the app stores sensitive data or payments, hire a pentest specialist.

Emails

  • every transactional email arrives: welcome, confirmation, password reset, invoice;
  • emails don’t land in spam in Gmail and Outlook;
  • the sender domain has SPF, DKIM and DMARC set up;
  • links point to production, not to the test environment;
  • the content looks right on a phone and in dark mode;
  • names, amounts and dates are filled in correctly, including special characters.

Links to the test environment in production emails happen more often than you’d think. Check it in a real inbox, not only in the preview.

Forms and validation

  • required fields, formats (email, phone, tax ID, postcode), character limits;
  • special characters, emoji, very long text, leading and trailing spaces;
  • double-clicking “Submit” doesn’t create two orders;
  • a server error doesn’t wipe the data the user typed;
  • error messages say what to fix, not just “Invalid data”;
  • file upload: a large file, a wrong format, no file.

How to describe the problems you find so a developer can fix them without follow-up questions is covered in the guide on defect reporting.

Browsers and devices

combinationwhy
Chrome on desktopthe largest share of traffic
Safari on desktop (macOS)a different engine, different CSS and form bugs
Safari on iPhonealmost every browser on iOS uses WebKit
Chrome on Androidyour users’ most popular phone

If you have data from analytics or a beta, follow it. Also check widths of 360-390 px, the most common phone resolutions. For a native app I’ve prepared a separate mobile app release test plan.

Basic performance

  • the home page and the first screen after login load in under 2-3 seconds on a phone;
  • Core Web Vitals in the green: LCP up to 2.5 s, INP up to 200 ms, CLS up to 0.1 (check them in PageSpeed Insights);
  • images are compressed, and a list with hundreds of items is paginated;
  • a simple load test: a few dozen simultaneous users on the main path, if you’re planning a campaign or a press launch.

Full load testing usually isn’t needed for an MVP. The exception is a launch with a campaign after which you expect a traffic spike. Then it’s worth doing performance testing before the start, not after the first outage.

Basic accessibility

  • the whole critical path can be completed with the keyboard alone, and focus is visible;
  • a screen reader (VoiceOver or NVDA) reads buttons and form fields sensibly;
  • text contrast is at least 4.5:1;
  • images that carry content have alt text;
  • form errors are described in text, not only by colour.

This is a basic check, not a WCAG audit. If your product is subject to accessibility requirements, hire a specialist for a formal audit.

Monitoring and a rollback plan

  • frontend and backend errors go to a monitoring tool, and someone gets an alert;
  • you know how to roll back a release, and the team has rehearsed it at least once;
  • database migrations can be reversed, or you have a backup from before the deployment;
  • there’s a page or message ready for an outage;
  • it’s clear who is on call on launch day and the day after.

The first production bugs will appear anyway. What matters is whether you learn about them before your customers do and how fast you can go back to the previous version.

Data and GDPR: the basics

This is a technical list, not legal advice. Check that:

  • forms have the required consents, and marketing consents aren’t ticked by default;
  • the privacy policy is available and describes the tools you actually use;
  • the cookie banner appears if you use analytics or ads, and refusing really blocks the scripts;
  • users can delete their account, and their data also disappears from copies used for testing;
  • there’s no test data in production and no real customer data in the test environment.

Agree the scope of your obligations with a lawyer. I check whether the app does what the policy promises.

When to add an automated smoke test

An automated smoke test is worth adding before launch or right after it, if you deploy more often than once a week. That’s 5-10 Playwright tests of the critical paths, run on every deployment and taking a few minutes. They protect you from a fix in one place breaking sign-up or payment.

Full regression gets automated later, once the interface stops changing every sprint. In one of my projects, smoke tests covered 80% of the main features. I describe how to split tests into smoke and full regression in the guide on regression in CI, and automation as a service on the test automation page.

Pre-launch review

If you’d rather have someone from outside go through this list for you, I do a pre-launch review: exploratory testing of the critical paths plus an automated smoke test. It usually takes 1-2 weeks and costs PLN 6,000-10,000 net (about EUR 1,400-2,350). Other options and rates are in the guide how much does an independent senior QA engineer cost.

Describe your product and launch date in the contact form and I’ll reply with a test plan and a quote.

If the product is still to be built and you are looking for a proven team to build it, you can ask my company, the software house 2Simple.

Frequently asked questions

How much time does MVP testing before launch take?

The minimum is one day for the critical paths. A reasonable scope for a typical web app is 3-5 days, and 1-2 weeks with an automated smoke test and checks on mobile devices.

Does an MVP need automated tests?

Not from day one. 5-10 automated smoke tests of the critical paths, run on every deployment, are enough. Full regression gets automated once the product stops changing every sprint.

How many browsers and devices should I test an MVP on?

Start with what your users use. Without data, check Chrome and Safari on desktop, Safari on an iPhone and Chrome on Android. That usually covers the vast majority of traffic.

Does MVP testing cover security?

The basics, yes: access to other users' data after changing an ID in the URL, logging out, password reset. I don't do penetration testing. If the app handles payments or sensitive data, hire a pentest specialist.

Got a release in a few weeks?

Describe your project in the form. I'll reply with questions about scope or an initial test plan.