Skip to content
TestLine Menu
TestLine
QA process

How much does a QA audit cost and how long does it take? What's in the report

The cost, duration and course of a testing process audit, what the report contains and the signs it's worth ordering.

author
Artur Machowski, Senior QA Engineer
published
reading
6 min

Short answer

A QA audit with me usually costs PLN 10,000-15,000 net (about EUR 2,350-3,500) and takes one to three weeks, depending on the size of the team and the number of products. It consists of conversations with the team and a review of tools, defect reports and the CI pipeline. It ends with a report on gaps, risks and change priorities, a test strategy and plan, the regression scope and a list of tests to automate. We agree the price up front, after the first call.

Cost and duration

teamtimenet price
one team, one productabout 1 weekabout PLN 10,000
2-3 teams, or a product with a mobile and a web appabout 2 weeksabout PLN 12,000-13,000
several teams and productsabout 3 weeksabout PLN 15,000

Implementing changes after the audit (building regression, automation, configuring tools) is priced separately: at a fixed price per test suite or hourly, at PLN 200-250 net per hour.

How the audit runs

  1. Conversations. With developers, the product owner, testers (if there are any) and the person responsible for releases. I ask how a change is made and checked, from a backlog task to production.
  2. Review. Defect reports from recent months, especially from production, test cases, automated tests, the CI pipeline, test environments and data.
  3. Diagnosis. Where bugs leak into production, what slows releases down, which tests add nothing and what’s missing.
  4. Plan. A test strategy matched to your release rhythm, the regression scope, triage and defect lifecycle rules, and the order of automation.
  5. Walkthrough. Presenting the results to the team and deciding who implements the changes.

What’s in the report

sectionwhat it contains
current statehow you test today, who, when and with what
gaps and riskswhere bugs leak, with examples from defect reports
change prioritieswhat to do in the first month, quarter and later
test strategy and plantest levels, responsibilities, release criteria
regressionwhich scenarios to check before every release
automationwhat to automate first and how much it costs
metrics3-5 quality indicators the team will track, e.g. production defects and regression time

When an audit makes sense

  • Customers report bugs that should have been caught earlier.
  • Regression delays releases, or nobody knows exactly what to check before a release.
  • There are automated tests, but nobody trusts them, because some fail at random.
  • The team is growing and what worked with three people stops working with ten.
  • You’re hiring your first tester and want them to have something to start from. When the right moment comes is covered in when to hire your first tester.

What the audit doesn’t cover

A QA audit assesses the testing process; it isn’t security testing or a WCAG accessibility audit. If I notice a security issue along the way, I’ll report it and tell you when it’s worth hiring a pentest specialist.

How to prepare

Before the start it helps to have: access to the issue tracker (Jira, Azure DevOps, GitLab), the repository with tests and the CI pipeline, a list of releases from recent months, and one person on your side who will set up conversations with the team.

More about the scope on the QA audit and process setup page. Describe your team and the problem in the contact form and I’ll reply with a quote.

Frequently asked questions

How much does a QA audit cost?

With me, usually PLN 10,000-15,000 net, depending on the size of the team and the number of products. We agree the price up front, after the first call.

How long does a QA audit take?

Usually one to three weeks. A small team with one product takes about a week; several teams and products take 2-3 weeks.

What do I get after the audit?

A report describing the current process, gaps, risks and change priorities, a test strategy and plan, the regression scope, defect triage rules and a list of tests to automate.

Does the audit cover automated tests?

Yes. I assess the existing automated tests, their stability and their place in CI, and point out what to automate first.

Will you implement the changes after the audit?

I can: build regression, configure the tools and train the team. Or hand the plan over to your people if you prefer to implement it yourselves.

Got a release in a few weeks?

Describe your project in the form. I'll reply with questions about scope or an initial test plan.