Short answer
After testing you get defect reports as I go, in your tool (critical ones immediately) and a final report of 1-2 pages. The report opens with a recommendation: release, release with caveats, or hold. Then come the scope and environment, test results, open defects by priority, risks and what wasn’t tested. The first part makes sense to someone who isn’t a tester and has to decide on the release.
What the report consists of
| part | what it contains | for whom |
|---|---|---|
| summary and recommendation | 3-5 sentences: state of the build, whether to release, the main risk | whoever decides on the release |
| scope and environment | version, platforms, devices, environment, test dates | the team |
| results | number of scenarios: passed, failed, blocked | the team |
| open defects | a list by priority, with links to tickets | developers, product owner |
| risks | what could go wrong after release and how to limit it | whoever decides on the release |
| what wasn’t tested | areas out of scope or blocked, with the reason | everyone |
The last part is the one most often skipped, and it’s the most important for the report’s honesty. Without it, “0 critical defects” can simply mean payments were never checked.
Sample report (fictional data)
TEST REPORT: version 2.4.0, appointment booking app
Test dates: 3-7 March | Tester: [full name]
1. SUMMARY
Recommendation: RELEASE WITH CAVEATS.
The main paths (booking, payment, reminders) work on web, iOS and Android.
1 high-priority defect is open: on Android 12 the SMS reminder arrives
with the time in UTC. I suggest releasing after the fix, or switching off
SMS reminders on Android 12 until the next version.
2. SCOPE AND ENVIRONMENT
Version: 2.4.0 (build 412) | Environment: staging
Platforms: Chrome 131, Safari 18, iPhone 13 (iOS 18), iPhone 16 (iOS 26),
Samsung A54 (Android 14), Pixel 6 (Android 12)
3. RESULTS
Scenarios: 86 | Passed: 79 | Failed: 4 | Blocked: 3
Exploratory testing: 6 hours, 5 new defects
Smoke test in CI: 8/8 passed
4. OPEN DEFECTS
Critical: 0
High: 1 (BOOK-231 SMS reminder time, Android 12)
Medium: 3 (BOOK-228, BOOK-233, BOOK-235)
Low: 4
5. RISKS
- Payments tested in sandbox mode only. After release, check the first
real payment.
- High user load was not tested. A campaign is planned for April:
I recommend a performance test before it starts.
6. NOT TESTED
- Export to Outlook calendar (blocked: no test account).
- Tablets (out of scope for this version).
How to read the report if you’re not a tester
- Read the summary and recommendation. If the tester recommends holding the release, ask what has to change for it to go out.
- Check critical and high defects. Each one should have a decision: fix before release, or release knowingly with it.
- Read “not tested”. If it lists things that matter to the business, that risk is on your side.
- Ignore the number of passed scenarios as a measure of quality. 79 out of 86 says nothing without knowing which 7 failed.
What else you get
- Defect reports with steps, environment, expected and actual result, priority and a screenshot. I describe what they should look like in how to report defects.
- Test cases in your tool (Jira, TestRail, Xray or a spreadsheet), ready to reuse in later releases.
- Automated tests in your repository, if they were in scope, with instructions for running and maintaining them.
Everything stays with you when our work ends. You get a report like this after manual testing, mobile testing and every release under QA support. Describe your project in the contact form.