Short answer
Before launching a mobile app, check 40 points in 9 areas: devices and OS versions, install and update, critical paths, permissions, network, interruptions, notifications, payments and store requirements. On 4-6 devices that’s about a week of one person’s work. On Google Play with a new personal account, also plan 14 days of closed testing with 12 testers.
This checklist says what to check. Which devices to use and in what order is covered in the mobile app pre-launch test plan.
1. Devices and OS versions
- The oldest supported iOS and Android version, i.e. the minimum version set in the project.
- The last two major iOS versions and 4-5 Android versions.
- The smallest supported screen, a typical one and a large one, plus a tablet if the app supports it.
- At least one Android phone with a manufacturer skin and aggressive battery saving.
2. Install and update
- Fresh install and first launch: onboarding and consents.
- Update from the previous version with data and session preserved. At first release, prepare this scenario for the second one.
- Uninstall and reinstall.
- App size and first launch time on the weakest supported phone.
3. Critical paths
- Sign-up, including invalid data and an email address that already exists.
- Login, logout and session expiry.
- Password reset, with the link opened on the phone.
- The app’s main feature from start to finish.
- Deleting the account from within the app.
- One user’s data invisible to another, including after changing an ID in the request.
4. Permissions
- Allowing each permission: camera, location, notifications, contacts.
- Denying it, with a clear message on what the user can do next.
- Denying with “don’t ask again” and going to the system settings.
- Revoking a permission in settings while the app runs in the background.
5. Network and offline mode
- Launching the app with no network.
- Losing the network while submitting a form.
- Switching from Wi-Fi to mobile data.
- A slow connection: a visible loading state instead of a blank screen.
- A retried request doesn’t create a second order or a second payment.
6. Interruptions and lifecycle
- An incoming call while filling in a form.
- Switching to another app and coming back without losing data.
- Locking the screen and rotating the device.
- Dark mode and enlarged system font.
7. Notifications and deep links
- A notification when the app is closed, in the background and in the foreground.
- Tapping the notification opens the right screen.
- A link from an email or SMS opens the app, or the website or store when it isn’t installed.
- Turning notifications off in system settings doesn’t break the app.
How to check points 28-31 step by step is covered in testing push notifications and deep links.
8. Payments
- A successful payment and a declined one.
- In-app purchase in the App Store sandbox and with a Google Play test account.
- Restoring purchases and subscriptions after reinstalling.
- Cancelling a subscription and its expiry.
9. Stores and release
- A working demo account for App Store and Google Play reviewers.
- A privacy policy reachable in the app and on the store listing.
- App Store privacy labels and the Google Play data safety form match what the app actually collects.
- Permission descriptions in
Info.plistand an up-to-date target API on Android. - Crash reporting works in the production build, and a plan for a quick fix is ready.
Points 36-39 are the most common reasons for store rejection. I cover the details and 2026 requirements in how to get your app past App Store and Google Play review.
What to automate from this list
Before the first release most points are better checked by hand, because the UI is still changing. It is worth automating points 9-12 and 32 straight away, i.e. sign-up, login, password reset, the main feature and payment, in Appium or natively in XCUITest and UIAutomator. A smoke test run on every build like this makes sure later fixes before launch don’t break the most important paths.
How I can help
I can go through this checklist on your app as part of mobile testing: a pre-launch review with exploratory testing and an automated smoke test costs PLN 6,000-10,000 net and takes 1-2 weeks. Describe your app in the contact form. If the launch also includes a web app, the MVP testing checklist will help.
If the app is still to be built and you are looking for a proven team to build it, you can ask my company, the software house 2Simple.